
Product Overview
JB Battery battery pack—engineered for reliability in emergency lighting applications. Built with high-grade cells and spot-welded nickel tabs for low resistance, this pack delivers stable output, long cycle life, and consistent performance across Australian and New Zealand conditions.
Specifications
| Parameter | Value |
|---|---|
| Chemistry | Ni-Cd |
| Nominal Voltage | 3.6V |
| Capacity | 4000mAh |
| Configuration | 3 D Cell Stick |
| Connector | - |
| Bracket | Mounting Cap |
| Dimensions (L×W×H) | 184.5mm x 34.2mm x 34.2mm |
| Operating Temp | −10°C to +50°C |
| Compliance | IEC 61951 (performance) | IEC 62133 (safety) |
| Warranty | 1 Year JB local support (AU/NZ) |
Downloads
- 📄 Datasheet (PDF)
- 🧪 MSDS / Safety Information (PDF)
Product Matching – Emergency Lighting Brands
Coming Soon